Supervision tracking based on FS requirements
Extend RBT feature to track the % of Supervision hours provided by staff for each client. Ability to set up set up the parameters based on FS needs, such as 5, 10, 20 %. Be able to track by client or staff.
1
vote
phorejsi
shared this idea